Modular smart factory for manufacturers · sold in packs

A basis for promising delivery
when you take an order,
built in 4 weeks.

We don't sell MES or SCM by the piece. We sell packs: 2–3 modules and the seam between them, bundled around «one business problem». The first is the Delivery Promise Pack — ₩8.64M a year, 4-week standard build. And the 3D factory game is free forever, no sign-up.

Packs get cheaper as you buy4-week standard buildWithin the basic support cap
SCROLL ▼
Which problem are you facing

A plant manager doesn't wake up thinking "I need an MES".
They wake up thinking "another delivery just blew up".

Sell modules one at a time and the differentiation disappears; sell all 12 at once and nothing sells. So we sell «the smallest unit that contains a seam»: the pack. It is deliberate that no pack name contains MES or SCM.

Flagship
⏱️

Delivery Promise Pack

"We have no basis for promising a delivery date when we take an order"

🧾 Sales · Purchasing SCM📅 Production Planning
₩720,000/mo
₩8,640,000/yr · first purchase
📡

Machine Impact Pack

"When a machine stops, we only find out in the afternoon which orders are late"

📅 Production Planning🏭 Production MES📡 Equipment IoT
₩1,440,000/mo
₩17,280,000/yr · first purchase
🔍

Defect Tracing Pack

"A defect occurred and we don't know which customer shipments it reached"

🏭 Production MES📈 Quality SPC Analysis🔮 FMEA · Quality
₩1,200,000/mo
₩14,400,000/yr · first purchase
📦

Material Flow Pack

"Inventory and production live in separate worlds"

🏭 Production MES📦 Warehouse Management
₩880,000/mo
₩10,560,000/yr · first purchase
📐

Flow Improvement Pack

"Machines never idle, yet lead times keep growing"

📐 Factory Layout🚚 Logistics Simulation
₩600,000/mo
₩7,200,000/yr · first purchase
Mid-sized entry path
🧠

Ontology Control

"We have many systems, but none of them talk to each other"

🧠 Ontology · AI Control
₩1,500,000/mo
₩18,000,000/yr · first purchase
A scene competitors cannot build

When a machine stops, which customer's delivery slips and by how many days — in 2 seconds.

What the game sells is not features but «the pain of not being connected». A problem erupts and you can't find the cause because nothing is connected → switch the connection on and find it in 2 seconds. That drop is the game's only purpose.

📡Machine stop
vibration over 3.5
⚙️Process
FIN-01 finishing
📋Production order
MO-0412 · 0418
📦Product
P-2201
🧾Sales order
SO-2026-117
🏢Customer
Company A · 10/15 → 10/19
✕ Not connected — you find out in the afternoon, after phoning three departments.
✓ Connected — 2 seconds. You know immediately which customer to call first.
Where free ends and paid begins

Understanding is free, operating is paid.

The rule is one line — «paid from the moment your company data goes in». Show too much in the game and people say "I've seen enough" and don't buy; show too little and they don't understand and don't buy.

① Marketing · free forever

🎮 Factory Game

₩0 · no sign-up

Virtual factory · sample data only. Scenario play · seam experience · case reading · one-page diagnostic report. Email only when you request the report.

② Training · bundled with contracts

🎓 Game Training Edition

12 months included with the pack contract · then ₩2.4M/yr

A «your factory» edition loaded with the customer's real master data. Read-only mirror. Trains staff during the 4-week build so they use it on opening day.

Expansion ladder

The more you buy, the cheaper it gets.

Pack price = (list price of the modules you don't yet own) × 0.8. Modules you already own are not charged. The moment a customer sees «owned-module deduction −₩4.8M» on the first line of the second quote, the reason for a third purchase is born.

StepPackList priceYou paySaving
1⏱️ Delivery Promise Pack864864
2📡 Machine Impact Pack1,7281,248−28%
3🔍 Defect Tracing Pack1,440768−47%
4📦 Material Flow Pack1,056384−64%
5📐 Flow Improvement Pack720720
6🧠 Ontology Control1,8001,800
KRW/yr · buying in order
The 12 modules that make up the packs

The districts of the factory city in the game are the product itself.

This is not an educational imitation. Production MES · APS · FMEA · SPC · work analysis · PLM · SCM · WMS · costing · groupware · equipment IoT are installed in the game as the real service modules, and a pack bundles 2–3 of them with the seam.

📐
01 / BUILD

Factory Layout

2D layout is the source, 3D is derived. Drag and the logistics distance updates live; overlay a ghost to compare two options.

Preview screen →
📅
02 / PLAN

Production Planning · APS

Drop an order onto the finite-capacity Gantt to schedule it; overlap and the server rejects it. Bottlenecks become visible.

Preview screen →
🏭
03 / OPERATE

Production · MES

MO release → SFC good/scrap → operator POD. The real MES module, unchanged.

Preview screen →
🔮
04 / QUALITY

FMEA · Failure Forecast Bureau

Bombs on forecast processes cost the normal loss; unforecast ones carry a 1.5× surcharge. Real bomb history corrects O·D.

Preview screen →
📈
QUALITY INTELLIGENCE

Quality Statistics · SPC

Xbar-R · Cpk · ML forecasting · XAI diagnosis. Catch the trend before scrap piles up.

Preview screen →
🎬
05 / IMPROVE

Site Improvement · Work Analysis

Tag VA/NVA in the video and adopt ECRS countermeasures. Only the server knows the answer segments.

Preview screen →
🚚
06 / SIMULATE

Production · Logistics Simulation

3D logistics derived from 2D. Crossing bottlenecks and transport round trips are converted into tokens.

Preview screen →
📡
CONNECTED FACTORY

Equipment IoT · Virtual Devices

Virtual sensors and real PLCs use the same topic convention. Cross a threshold and a bomb goes off.

Preview screen →
🧾
SUPPLY NETWORK

Sales · Purchasing SCM

Sales order → purchasing → trade → subcontracting. Every voucher flows into the token ledger.

Preview screen →
💰
FINANCIAL CONTROL

Costing · Finance

Pre/post costing and month-end close. The team's decisions come back as profit and loss.

Preview screen →
📦
WAREHOUSE CONTROL

Warehouse · Barcodes

Rack generation · count adjustments · picking verification. When stock is off, delivery wobbles.

Preview screen →
🧩
ENGINEERING

PLM · BOM · 3D

Pick the BOM from the 3D shape. Miss the seal kit and you get a cannot-assemble bomb.

Preview screen →
📨
TEAM WORKSPACE

Groupware · e-approval

Approval waiting time ticks by the second. Let it sit and money leaks.

Preview screen →
🧠
ONTOLOGY

Ontology · AI Control

Connects your existing ERP · MES · machines into a knowledge graph, and Qwen control answers questions. "You keep every system you already use. We just connect them."

💣
GAME

Mission bombs · token race

In the game, bottlenecks, threshold breaches and cannot-assemble errors explode as bombs and are settled in tokens — a device to feel the pain of disconnection first.

🎛️
EDU

GM console · Training Edition

In the Training Edition you open sessions on your own company master data and train staff. Auto-grading · per-team contribution.

Two entry paths by company size
Small & medium manufacturers (50–200 employees) · Excel and paper

"We give you a basis for promising delivery dates in 4 weeks"

Delivery Promise → Machine Impact → Defect Tracing → Material Flow → Ontology. CEO or plant manager can approve; around ₩10M.

Mid-sized manufacturers (200+ employees) · ERP and MES in place but not connected

"You keep every system you already use. We just connect them"

Enter through the ontology connection layer and fill only the missing modules. IT executives, from ₩50M.

How we sell

The 2,310 smart-factory integrators are not competitors — they are a distribution network.

They installed the machines and systems, yet the customer's staff can't use them — every integrator's shared homework. Bundle the Training Edition and packs as the training and integration module of their implementation package: they win more bids, we gain 2,310 sales channels with no sales force. 30% reseller margin · no sales quota. Globally, certified partners at 35%, starting with Korean-owned overseas plants.

Know-how shared between customers

Only cases with numbers stay.

Reading is free (marketing); «applying to my environment» is paid (revenue). Mix the two and you lose both.

🎬ASite Improvement · Work Analysis

Two NVA segments found in a 148-second assembly video — 128 seconds with ECRS

Cycle −13.5% · line-balance efficiency +9 pp
Problem: could not find the waste segments in the 148-second process-1 assembly; tagging score 0. Analysis: broke the job into 6 motion elements as VA/NVA and SYNC-played before/after videos in comparison analysis. Action: adopted the ECRS "combine" countermeasure and moved one element to process 2 in line balancing. Result: 128 seconds, LB efficiency +9 pp (3T reward per 1 pp).
Team Lens · DK Co. · Production EngineeringAdoptions 31
🧩APLM · BOM

A BOM decomposition checklist that never misses the seal kit

BOM accuracy 100% · zero B-05 cannot-assemble bombs
Problem: decomposing the BOM from the 3D shape alone misses the seal kit (a hidden part) and triggers a B-05 bomb. Analysis: collected each team's wrong-answer patterns among the 8 decoys in the catalogue. Action: added a "sealing at every joint?" check to the decomposition procedure. Result: 100% BOM accuracy three rounds in a row, zero wrong-answer penalties.
Team Seal · Pusan National University · Mechanical EngineeringAdoptions 28
🔮AFMEA · Quality

Vibration drift toward threshold 3.5 caught by the FMEA forecast — exempt from the 1.5× surcharge

B-07 forecast hit · loss −2,100T
Problem: the virtual device's vibration channel crossed threshold 3.5 in 21 ticks and B-07 fired automatically. Analysis: compared the drift trend on the machine screen with the measured O·D corrections on the FMEA sheet. Action: kept the countermeasure (preventive maintenance) open to switch to forecast status. Result: the explosion loss was charged at the normal multiplier, exempt from the 1.5× surcharge, −2,100T.
Team Oracle · Hanbat National University · Industrial EngineeringAdoptions 22
FAQ

Frequently asked questions

Can I buy just one module?

We only sell packs. The differentiator is not the completeness of each module but the «seam» between them; buy a single module and you stop at an ordinary WMS without experiencing it. The pack is the smallest unit that contains a seam in the first purchase.

Why does the second pack cost less?

Pack price = list price of the modules you don't yet own × 0.8. Modules you already own are not charged. Production MES is in three packs and planning in two, so the second and third packs keep getting cheaper.

Is the game really free? No sign-up?

Yes. Free forever, no sign-up. The only paid boundary is «the moment your company data goes in». We ask for an email only when you request the report.

How long does implementation take?

The Delivery Promise Pack is a 4-week standard: weeks 1–2 master data cleanup, week 3 seam integration and CTP rules, week 4 validation on 3 real orders and training. Staff practise in the Training Edition during those 4 weeks.

Can I combine it with government support programmes?

The Delivery Promise Pack fits within the basic cap (up to ₩30M): your cost about ₩10.3M. Advanced 1 is Machine Impact + Defect Tracing; Advanced 2 is Material Flow + Ontology Control. Support money is «one more pack», not a discount.

Can universities and institutions use it too?

Yes. Universities, training institutes and corporate training teams that use the game in their curriculum subscribe per team (Free Lab · Team · Campus). The first cohort (up to 12 weeks) is free without a card. Institution pricing →

Takes 3 minutes

Take away one page for the CEO's desk.

The problem you selected · what it costs today · what changes once connected · the pack you need · your cost with government support · next step.

Get the one-page diagnostic reportBook a 30-minute online diagnosis